top of page


Enhancements
2026
Road Enhancements
TR-195 to Twp line at 265. treat with #8 stone.
North Vision Drive. Treat with #8 stone.
Tr-180. Dip the ditch and install a catch basin at 12025.
Tr-180. Catch Basin install rip rap at 14447.
Tr-135 to SR-67. Cut off the culvert ends and seal the surface after culvert work is completed.
bottom of page